Commit Graph

3 Commits

Author SHA1 Message Date
901c5c426e Consolidation pass: HR-only access, effective-dated mutations, data integrity guards, test suite
Reworks the app from a two-role (hr_admin/manager) model to a single
HR-only role gated by profiles.is_active, fixes transfer/promote/karenz/
reorg RPCs to actually defer future-dated changes via a new
pending_org_changes table instead of writing them immediately (applied
by a daily Vercel Cron route), makes reorg undo append-only instead of
deleting history, adds Karenz-return and history-date integrity guards,
deprecates the salary column, and adds explicit schema grants + perf
indexes needed to run against a fresh (non-hosted) Postgres instance.

Adds vitest unit + integration test suites (the latter against a real
local Supabase instance) covering all of the above, plus lint/typecheck/
build wiring (`npm run check`).
2026-07-14 20:32:20 +02:00
131ca7ece7 Daten aendern: effective date, searchable UN country pickers, 2 more bugfixes
Feature requests from live use:
- "Daten aendern" was missing a "Wirksam ab" field (unlike Versetzen/
  Befoerdern/Karenz, which all have one) - every change was silently
  logged with today's date. Added the field, threaded through
  change_employee_data (defaults to today if omitted).
- Staatsbuergerschaft and Wohnland now use a searchable picker
  (components/ui/CountryPicker) over the full 193-country UN member
  state list (lib/countries.ts) instead of the original ~9/5-value
  picklists. Dropped the now-too-narrow CHECK constraints
  (supabase/schema_2.sql) since the app is the source of truth for
  valid values, same approach used elsewhere for large open-ended
  pickers.

Two more real bugs found via live testing of the above (both in
change_employee_data, supabase/functions.sql + functions_4.sql):
1. `text[] || 'literal'` is ambiguous in Postgres - it can resolve to
   the array||array overload and try to parse the plain word as array
   syntax ('{...}'), failing with "malformed array literal". Hit on
   every single field-diff line the moment a user actually changed
   something (Staatsbuergerschaft first, then Beschaeftigungsausmass
   confirmed the same root cause). Fixed everywhere by switching to the
   unambiguous array_append() function.
2. The contract_end_date diff-check cast an empty string straight to
   date ("invalid input syntax for type date: ''") instead of using the
   same nullif(...,'')::date guard the UPDATE line below it already had.

Verified live end-to-end after both fixes: changed Staatsbuergerschaft
to Brasilien with a backdated effective date, save succeeded, Stammdaten
tab reflects it, and employee_history got the correct event_date
("2026-07-01") and description ("Geänderte Felder: Staatsbürgerschaft,
wirksam ab 2026-07-01"). Reverted the test employee's data back
afterward; seed data is clean again.
2026-07-13 23:30:43 +02:00
ef9852b09c Phase 1: project foundation for Alpenwerk HR
Scaffolds the Next.js 16 / TypeScript strict / Tailwind v3 app per
NEXTJS_REBUILD_SUPERPROMPT.md, and implements the Foundation slice from
the Phase 1 plan:

- Corrected Supabase schema (supabase/schema.sql): org units, employees,
  history, positions, hire drafts, saved reports, audit log, reorg
  scenarios, role-based profiles, salary-masking view, RLS policies,
  auto-derivation triggers, position-number generator.
- Seed script (supabase/seed.ts): ~800 realistic Austrian employees across
  9 divisions / 16 departments / 35 teams, history, 8 open positions, and
  hr_admin/manager test accounts.
- Supabase clients (lib/supabase/*), design tokens (tailwind.config.ts),
  format/color helpers (lib/format.ts, lib/colors.ts).
- Shared UI kit (components/ui): Avatar, StatusChip, Toast, Modal,
  SlideOver, SegmentedControl, Lookup.
- Auth (login page, Server Actions) and proxy.ts (Next 16's replacement
  for middleware) guarding the authenticated route group.
- Shell (Sidebar, Topbar, NewHireButton stub) and the Dashboard page,
  reading live data via employees_directory.

Employees list/detail, hire wizard, action panels, org chart, positions,
reports, and audit log are deferred to later phases per the plan.
2026-07-13 21:44:28 +02:00